Adaptive Reuse Project Auto Body Shop Transformed into Live-Work Gem in Sunny Boca Raton

By: Julie Lundin, LEED AP ID+C, IIDA

So, what does adaptive reuse mean in real life?

Adaptive reuse is when you go to an art gallery… in a former church, when you attend a community event… in an old barn, when you book a Costa Rican vacation and your hotel is made out of shipping containers!  With the COVID-19 pandemic, the concept of repurposing the built environment has become even more important. Vacant office space becomes a healthcare facility.  Hotels turn into healthcare worker housing. A shopping mall is suddenly a medical center.

As an interior designer, I have always been intrigued by adaptive reuse projects.  Projects where a design team has expertly executed a vision for a forgotten run-down building or interior space and brought it back to life. They hold a special place in my heart. When the opportunity arose to purchase, design, and renovate an abandoned auto garage in Boca Raton to use as a live/work space, it was a dream come true.  As an adaptive reuse project, the most important initial points of consideration begin with safety, accessibility, and compatibility. These basic points are relevant no matter what is being considered, from energy to building materials to assessing current building code requirements.

Keeping the form or structure of a building intact while changing its function is challenging. However, it can provide significant environmental and economic benefits. Adaptive reuse projects have utilized sustainable design concepts long before LEED and green building became popular.  Adaptive reuse is one of the most maximized uses of recycling.  The value of reuse, recycle and repurpose is intrinsic to these projects. 

Benefits of Adaptive Reuse

  • Adaptive reuse is sustainable
    • Greenest building is one that already exists
    • Reduction in building materials needed to transform a space
  • Environmental Stability
    • Reduces energy consumption associated with demolishing a structure
    • And building a new one to replace it
  • Economic Stability
    • Potential cost benefits associated with greenfield development
      • Legal issues
      • Zoning problems
      • Finance
      • Design and Construction Costs
      • Environmental Impacts
  • Spaces may be useful for fledgling businesses
    • 16% less costly than other forms of construction
    • Results in lower leasing rate
  • Faster than new construction
    • Renovated existing building ready for occupancy sooner
  • Preservation of local identity
    • Older buildings add and establish the character of local built environments
    • Preserves a local sense of place and authentic experience
  • Utilization of a previously developed site
    • Avoids development of greenfields
    • Utilizes existing utility infrastructure
    • Minimizes impact on watersheds and stormwater systems
  • Reusing existing building elements
    • Cost savings
    • Embodied energy savings
    • Construction waste savings
    • Time savings
  • Utilize the character of existing spaces and materials

Below is my adaptive reuse project story.  I hope you enjoy it!

Auto Body Shop Transformed into Live-Work Gem in Sunny Boca Raton

AFTER (Continue reading for Before…)

Boca Raton, Florida is well known for its affluent gated golf communities, manicured landscapes, and pristine beaches. Unlike cities such as Pittsburgh and Cincinnati where industrial is synonymous with the name, Boca’s industrial area is inconspicuous.  That is why the unexpected location of this industrial section is the perfect setting for a hidden gem, a distinctive live-work studio. What was once a run-down auto body shop with ground contamination was transformed into an office, studio, and residence. With a commitment and passion for design, the built environment, and sustainability, this industrial property has been repurposed into a warm, inviting, and environmentally friendly enclave.

Auto garage office BEFORE

The base footprint of the building is 1,950 square feet. The front of the building houses the residential space which includes a kitchen, bathroom, open living space and a cozy loft which provides an additional 240 square feet. This portion of the building was designed to be self-contained with a separate entrance and electric meter should future usage needs change. A peek inside the space shows a metal spiral staircase leading to the loft. The spiral stairs were kept intact from the original body shop but painted a soft metallic gold as a nod to the design firm’s name Golden Spiral Design.

AFTER

The small footprint of 1,950 square feet required creative design solutions to maximize the multi –

functionality of the space. The live work concept had to become truly integrated based on the building size.  The residential component made sense to be in the front portion of the building which allows a separate entrance.  The main auto garage became the office/studio but is designed as a flex space to accommodate large meetings or entertaining on the weekends. To delineate areas of the open space, furniture placement, lighting and plants were utilized.

Auto garage BEFORE

The back portion of the building was originally an auto painting stall and allows for privacy once the large, colorful barn door is closed.  High gloss cabinetry was added for much needed storage and includes a murphy bed. This space also contains an added ADA bathroom, free standing glass shower, and washer and dryer.

 The walls are painted a crisp white which showcase the concrete block walls, their inherent imperfection, and years of use.  A modified exposed interior was created with galvanized metal soffits that hide electrical and air conditioning components.  The three original overhead garage doors are still intact and used as metal shades for privacy and sun control.  The garage concrete floors were polished and sealed still showing the shapes, imperfections, and natural patina of the building. Old Chicago brick was added to both the interior and exterior walls to emulate the character of old industrial buildings. 

AFTER

The grounds were designed to visually create an inviting enclave.  Sustainable fencing was installed which offers privacy and security. The front apex, once an eyesore, is a green oasis with bronze trellises, jasmine vines, orchids, and a custom mosaic.  Sustainable, resilient and energy efficient principles were applied throughout the design and specifications of this building.

Building BEFORE

Below are key sustainable concepts that were utilized for this project.

  • Site Remediation
  • Construction Waste Recycling
  • Adaptive Reuse of Undesirable Property
  • Highly Reflective Roof and added Insulation
  • No additional Building Footprint added
  • Solar Panels and Battery Storage
  • Energy Efficient HVAC
  • Energy Efficient Windows
  • Energy Efficient LED Lighting
  • Low Flow Plumbing Fixtures
  • Energy Efficient Appliances
  • Recycling and Composting
  • Low VOC Paint and Finishes
  • Daylighting
  • Interior Plantscapes
  • Exterior Drip Irrigation System

Converting this building to a multi-use habitable space was both challenging and rewarding.  It was important to design the space using the existing building footprint (bigger is not better), to remediate the undesirable brownfield, to take advantage of the industrial character, and to promote sustainability throughout the entire design process. 

With the arrival of the COVID pandemic it has never been more important to have a healthy and safe place to work.  For questions about the adaptive reuse of this building – or the potential of a building you own – please contact me, Julie Lundin, at (561) 866-4741 or [email protected].

LEED Project Update

4/19/15

Julie

 

By Julie Lundin, Founder,
Director of LEED Process Management for Emerald Skyline Corporation

 

Emerald Skyline Corporation in conjunction with Golden Spiral Design, is designing, renovating and repurposing an unoccupied industrial building located in Boca Raton, FL. This distinctive commercial building will include many sustainable features with the intent to obtain LEED certification from the USGBC.

Existing

Existing

Proposed

Proposed

 

 

 

 

 

 

 

 

 

 

Proposed LEED Certified Building

For general information on this project please Click Here to see our last post.

We have been busy working on the design and drawings in preparation for submission to the City of Boca Raton Development Services Department. The design of the building has taken many twists and turns over the last few months. Since we are doing a major renovation and constructing a second floor, the design and location of the stairs and an elevator have been instrumental in our building’s design. As with any project, the site plan and its setbacks limit the building footprint that will be utilized.

Based on our site plan, we do have the space to bump the front of the building out to accommodate our new staircase. This allows us to construct the stairs without having to penetrate the existing building ceiling membrane. In addition, it creates an interesting design element that does not deduct precious square footage for the stairs construction.

We have also decided to locate the elevator on the outside of the building. Again, an exterior location will not deduct square footage from the base building plan. Since the elevator shaft will be located on the exterior, building fire codes will be different than if the elevator was located internally. We are anticipating that the elevator will be a prominent design feature and contribute to the aesthetics of our project.

As stated in our previous post, this project is a proposed LEED certified building. A key component of a LEED project is its reduced energy use. Our initial design utilized solar rooftop panels to generate power for the building even with the hopes of generating enough power to sell back to the grid. Florida’s large utility monopolies and lawmakers have worked successfully to block and control who can generate solar energy and what it can be used for; thereby restricting its use by homeowners and businesses. The Florida legislature, at the direction of the utility companies, have gutted the state’s energy savings goals and entirely eliminated Florida’s solar-rebate program. Due to this situation, we are now exploring alternative methods of energy including fuel cell technology powered by natural gas.

There is a pro-solar group in Florida, Floridians for Solar Choice, that is seeking to make solar more accessible in the state. Their ballot petition seeks to expand solar choice by allowing customers the option to power their homes or businesses with solar power and chose who provides it to them. Please visit their website to learn about this initiative and sign the petition. www.FLsolarchoice.org.